Generate draft timetable
At early stages of timetable generation it is advised to try to generate draft. Draft is timetable without any constraints. This is very usefull, because it makes no sense to generate complete timetable with all the inputted constraints if there is some basic problem in the input.
You can either remove the constraints, or use a feature called draft:
After selecing "Draft" generation, you can specify which constraints you want to turn off. Simply select them and and press button "Deactivate" or "Activate":
Then press "Generate" and a timetable will be generated with the constraints you allowed.
From version 2014 it is possible to specify for each constraint if it shall be strict or if it can be relaxed. This can be useful when you want to generate a full timetable with relaxation, but you do not want some special constraints to be relaxed:
 
                 English
								English							 Slovenčina
								Slovenčina							 Deutsch
								Deutsch							 España
								España							 Francais
								Francais							 Polish
								Polish							 Russian
								Russian							 Greek
								Greek							 Lithuania
								Lithuania							 Romanian
								Romanian							 Arabic
								Arabic							 Português
								Português							 Indonesian
								Indonesian							 Croatian
								Croatian							 Serbia
								Serbia							 Farsi
								Farsi							 Hebrew
								Hebrew							 Mongolian
								Mongolian							 Bulgarian
								Bulgarian							 Georgia
								Georgia							 Azerbaijani
								Azerbaijani							 Thai
								Thai							 Turkish
								Turkish							 Magyar
								Magyar